Job #386

Completion Date: June 2015

New 60 MMSCFD Cryogenic Gas Plant, Ex-Works. This plant is designed for rich gas (7.0 gal/mscf), high ethane recovery, 99% propane recovery, and includes: Product treating system, product pumps and 15,000 gallon product surge tank Modular MCC building 1,400 HP refrigeration system I/A system Ethane rejection capability Low re-compression requirement 1,100 psig and 400 psig design pressure on high pressure and low pressure sides, respectively